I-CARRY (US)

Intralogistics Automation Integrator · California

A Six-Stage Turnkey Delivery Process

From first site survey to full-lifecycle support — controlled, accountable, transparent.

Every project follows the same six stages so you always know what is happening, who is accountable, and what comes next. California engineers lead design and commissioning; our global manufacturing partners handle fabrication and pre-test.

  • OSHA / NFPA / ANSI / UL aligned
  • California-led delivery
  • 24/7 lifetime support

How we deliver

A Six-Stage Turnkey Delivery Process

From the first site survey to full-lifecycle support — every project follows a controlled, accountable delivery methodology.

  1. On-Site Survey

    California engineers analyze your facility layout, material flow and throughput targets to establish the automation baseline.

  2. Solution Design

    We design a site-specific AGV, AMR, automated forklift or ASRS solution aligned with U.S. safety standards (OSHA, NFPA, ANSI, UL).

  3. Manufacturing & Testing

    Equipment is built and pre-tested at global manufacturing facilities before it ships to your site.

  4. Installation

    Our California technical team manages on-site installation, commissioning and integration with your WMS/WCS.

  5. Operator Training

    Certified training for operators and supervisors — from daily workflows to safety procedures and fault recovery.

  6. Full-Lifecycle Support

    24/7 remote monitoring, on-site maintenance, local parts inventory and quarterly performance reviews.

What you get

A predictable engagement — with the paperwork to prove it.

Every stage ends with a deliverable you can sign off on. We do not move to the next stage until the previous one is approved.

  • 1

    Site Survey & Baseline Report

    Layout, throughput, SKU profile, safety hazards, IT landscape — captured in a written baseline you keep.

  • 2

    Solution Design & ROI Model

    Equipment list, throughput simulation, total cost of ownership and ROI model — all sign-off-ready.

  • 3

    Factory Acceptance Test (FAT)

    Pre-shipment test at the global facility, with a recorded FAT report you receive before installation begins.

  • 4

    Site Acceptance Test (SAT)

    On-site installation, integration with your WMS/WCS, and a documented SAT before go-live.

  • 5

    Training & Certification

    Operators and supervisors trained on daily workflow, safety procedures and fault recovery — with certification records.

  • 6

    Quarterly Performance Reviews

    24/7 hotline, on-site maintenance, local parts inventory, and a quarterly review meeting with KPIs.

Want the timeline for your project specifically?

Send us your throughput, layout and timeline constraints — we will sketch out a stage-by-stage plan.